Context
Three direct failures in the dock NL census require a Workspace-root motion pulse before checking post-splitter grid behavior: both WorkstationGridRepaintNL cases and the repeated-drag case in WorkstationSplitterGridGeometryNL.
The worker/DOM trace at 335b2ca43a records a root class interval of about 1 ms, no root DOM transition, and refresh settlement hundreds of milliseconds later. The ten-cycle discriminator awaits the existing projection promise: all ten feed repaint checks pass, while all ten retained soft root-pulse assertions still fail.
The Problem
A transient presentation class is being used as a mandatory completion witness. Worker class updates can coalesce before DOM application. A descendant overflow pulse is not a substitute: observed pulses began before the relevant refresh and cleared before it settled. The existing >20 px geometry check may also be satisfied by live resize preview.
These witnesses should reach their actual grid repaint/geometry assertions after the committed projection settles, including legitimate instant presentation.
The Architectural Reality
Workspace.onDockZoneDocumentChange schedules each committed projection on refreshPromise. Its completion hook includes the Workstation overflow, FLIP, host-update and participation waits.
InstanceService.callMethod already resolves dotted paths and awaits the returned value. The fixture can call app.callMethod(wsId, 'refreshPromise.then'); no new engine or MCP API is needed.
- Typed projection failures can resolve an attempt while scheduling a replacement retry. The existing warning is retained by ConnectionService and readable through
app.getConsoleLogs; assert its absence so a handled failure cannot count as clean settlement. A runtime negative control invokes the actual failure handler and must red this guard.
- The tested wait follows observation of the new committed split sizes. In the controlled ten-cycle run, a fresh traced refresh settled for each gesture, with waits of 244–441 ms.
DockFlip.play returns false for instant presentation. WorkstationDockFlipResizeNL explicitly accepts a no-FLIP live-parity path and retains its own visual-discontinuity oracle. Those animation-specific assertions remain separate.
- The Main trace observed visible documents, valid 280 ms tokens, six markers, and false play results in every cycle. It does not establish which instant exit was taken.
The Fix
Replace the three positive root-motion barriers with the existing committed-projection wait after the semantic change has been observed. Remove their unused observer helpers/state. Preserve each witness's existing input mechanism and every actual repaint, geometry, identity, error and residue assertion.
Update settlement comments to describe the owner being awaited. Do not equate a source-class interval, a descendant pulse, a changed live-preview width or a generic VDOM cycle with committed projection completion.
Contract Ledger Matrix
| Surface |
Authority |
Required behavior |
Failure |
Docs |
Evidence |
| Post-splitter synchronization in the two E2Es |
Existing Workspace refreshPromise and dotted call_method await |
Await the current projection after the observed commit, then run the original oracles |
A rejected/missing wait fails; changed data or live preview alone cannot advance checks |
Local test intent |
Before/after full selected files; delayed/fresh settlement discriminator |
| Grid proof |
Existing visible-record repaint and keyed worker/header/cell comparisons |
Same workload, repeated directions, identities, tolerances and residue checks |
Real drift remains a failure |
Existing oracle documentation |
Current-head headed E2E receipts |
Acceptance Criteria
Out of Scope
Production motion changes, forcing a visible frame, new engine/NL APIs, changing input provenance, broad five-spec rewrites, the adjacent EdgeSplitter/NestedColumn failures, and closing any actual repaint or film defect by association.
Avoided Traps
Do not broaden the observer to any descendant, remove the positive barrier entirely, add sleeps, weaken the grid assertions, or treat false FLIP as a broken animation contract without its own evidence. A plain promiseUpdate does not await a deferred projection.
Decision Record impact
No ADR or production contract change; this consumes existing projection ownership.
Sweeps and ownership
Latest20 live open issues, all-state recent30 A2A and own eight assignments checked immediately before filing. Own playback, vessel receipt/frame repair and F7 film bodies are distinct. MC query on the failing root-motion assertion recovers this session's diagnostics; KB found no equivalent repair. Grace explicitly handed over the motion family, retaining her separate DemoB lane. Labels verified.
Taking this as the sole active implementation claim; earlier authored PRs remain at human merge gates.
Related: #17844
Origin Session ID: 153d2e0a-ebae-4087-bcd5-3c92d213132c
Retrieval Hint: Workstation root motion pulse refreshPromise splitter repaint settlement
Context
Three direct failures in the dock NL census require a Workspace-root motion pulse before checking post-splitter grid behavior: both
WorkstationGridRepaintNLcases and the repeated-drag case inWorkstationSplitterGridGeometryNL.The worker/DOM trace at
335b2ca43arecords a root class interval of about 1 ms, no root DOM transition, and refresh settlement hundreds of milliseconds later. The ten-cycle discriminator awaits the existing projection promise: all ten feed repaint checks pass, while all ten retained soft root-pulse assertions still fail.The Problem
A transient presentation class is being used as a mandatory completion witness. Worker class updates can coalesce before DOM application. A descendant overflow pulse is not a substitute: observed pulses began before the relevant refresh and cleared before it settled. The existing >20 px geometry check may also be satisfied by live resize preview.
These witnesses should reach their actual grid repaint/geometry assertions after the committed projection settles, including legitimate instant presentation.
The Architectural Reality
Workspace.onDockZoneDocumentChangeschedules each committed projection onrefreshPromise. Its completion hook includes the Workstation overflow, FLIP, host-update and participation waits.InstanceService.callMethodalready resolves dotted paths and awaits the returned value. The fixture can callapp.callMethod(wsId, 'refreshPromise.then'); no new engine or MCP API is needed.app.getConsoleLogs; assert its absence so a handled failure cannot count as clean settlement. A runtime negative control invokes the actual failure handler and must red this guard.DockFlip.playreturns false for instant presentation.WorkstationDockFlipResizeNLexplicitly accepts a no-FLIP live-parity path and retains its own visual-discontinuity oracle. Those animation-specific assertions remain separate.The Fix
Replace the three positive root-motion barriers with the existing committed-projection wait after the semantic change has been observed. Remove their unused observer helpers/state. Preserve each witness's existing input mechanism and every actual repaint, geometry, identity, error and residue assertion.
Update settlement comments to describe the owner being awaited. Do not equate a source-class interval, a descendant pulse, a changed live-preview width or a generic VDOM cycle with committed projection completion.
Contract Ledger Matrix
Acceptance Criteria
Out of Scope
Production motion changes, forcing a visible frame, new engine/NL APIs, changing input provenance, broad five-spec rewrites, the adjacent EdgeSplitter/NestedColumn failures, and closing any actual repaint or film defect by association.
Avoided Traps
Do not broaden the observer to any descendant, remove the positive barrier entirely, add sleeps, weaken the grid assertions, or treat false FLIP as a broken animation contract without its own evidence. A plain promiseUpdate does not await a deferred projection.
Decision Record impact
No ADR or production contract change; this consumes existing projection ownership.
Sweeps and ownership
Latest20 live open issues, all-state recent30 A2A and own eight assignments checked immediately before filing. Own playback, vessel receipt/frame repair and F7 film bodies are distinct. MC query on the failing root-motion assertion recovers this session's diagnostics; KB found no equivalent repair. Grace explicitly handed over the motion family, retaining her separate DemoB lane. Labels verified.
Taking this as the sole active implementation claim; earlier authored PRs remain at human merge gates.
Related: #17844
Origin Session ID: 153d2e0a-ebae-4087-bcd5-3c92d213132c
Retrieval Hint:
Workstation root motion pulse refreshPromise splitter repaint settlement