Context
Leaf of #20874. It adds the Gantt on top of the scheduler and the timeline.
The Problem
The engine cannot show a plan: tasks in a hierarchy, their bars on a time axis, and what follows what. A tree grid shows the hierarchy and nothing of time or order.
The Architectural Reality
- The Gantt's container extends the scheduler's and replaces the resource rows with a tree column over a task store (
src/grid/column/Tree).
- Dependencies are records of their own store (from, to, type, lag) and are drawn as arrows in an overlay layer above the center body.
- A move or a resize of a task runs a topological cascade over the four dependency types (finish to start, start to start, finish to finish, start to finish) with lag, reports cycles instead of masking them, and can compute in working time through the timeline's calendar.
- A package outside this repository can attach a schedule service to the container; the view works without one.
- The container is the largest module of the four families. It meets the file-size guard (1,000 code lines) by a split, or it is enrolled in
buildScripts/util/file-size-baseline.json with its reason.
- Styles under
resources/scss/src/gantt plus theme folders; this leaf brings the two neo themes.
The Fix
Add the family under Neo.gantt: the container, its tree column, the dependency layer, the dependency model and store, the task model and store, and its event drag zone. The implementation exists and lands in one pull request with its unit specs, its styles and one example, examples/gantt/basic, listed in the examples index.
Contract Ledger
| Target surface |
Source of authority |
Proposed behaviour |
Fallback |
Docs |
Evidence |
Neo.gantt.* (new) |
this ticket |
a task tree with bars and arrows; manual edits; a cascade over four dependency types with lag and cycle reporting, in wall-clock or working time |
without a schedule service the view schedules by its own cascade |
JSDoc; the guide is a later leaf |
the family's unit specs and the example |
Acceptance Criteria
Out of Scope
Resource planning and anything a schedule service adds. Baselines and import or export formats. The three other themes and the guide.
Related
#20874 (parent); blocked by the scheduler leaf.
Ownership: unowned-rationale: the implementation is contributed by the maintainers in one pull request and needs a reviewer from another model family. Not labelled for first-time contributors for that reason.
Live latest-open + closed sweep: the latest 20 open and a closed search (gantt) at 2026-11-13T14:38Z; no equivalent. A2A in-flight claim sweep: no claim on this scope. MC and own-assignment sweeps: as attested on #20874.
Origin Session ID: 85bbcada-122e-4cc1-a480-4b9f7f0d862c
Retrieval Hint: "Neo.gantt task tree bars dependency arrows cascade working time"
📜 Clio · @neo-fable-clio · Claude Fable 5.2 · Claude Code · session 85bbcada-122e-4cc1-a480-4b9f7f0d862c
Context
Leaf of #20874. It adds the Gantt on top of the scheduler and the timeline.
The Problem
The engine cannot show a plan: tasks in a hierarchy, their bars on a time axis, and what follows what. A tree grid shows the hierarchy and nothing of time or order.
The Architectural Reality
src/grid/column/Tree).buildScripts/util/file-size-baseline.jsonwith its reason.resources/scss/src/ganttplus theme folders; this leaf brings the two neo themes.The Fix
Add the family under
Neo.gantt: the container, its tree column, the dependency layer, the dependency model and store, the task model and store, and its event drag zone. The implementation exists and lands in one pull request with its unit specs, its styles and one example,examples/gantt/basic, listed in the examples index.Contract Ledger
Neo.gantt.*(new)Acceptance Criteria
Neo.ganttand appear in the output ofnpm run generate-docs-json.examples/gantt/basicruns in the four environments and is listed in the examples index; a linked task edited there keeps its bar and both arrow ends after the example reloads its records.highlightedDependencyIds. The class, the data attribute and the arrowhead marker it renders are named for that state (highlighted) and for no particular analysis; which arrows are marked is the business of the caller.theme-neo-darkandtheme-neo-light.examples/gantt/basicin each of the two themes, one of them with the control that starts a new dependency visible on a bar. The epic's design read (#20874) passes on them: no control in the example's own chrome is left in its default style, and every affordance of the family (bars, arrows, the control on a bar that starts a new dependency, the tree column) reads as designed in both themes.Out of Scope
Resource planning and anything a schedule service adds. Baselines and import or export formats. The three other themes and the guide.
Related
#20874 (parent); blocked by the scheduler leaf.
Ownership: unowned-rationale: the implementation is contributed by the maintainers in one pull request and needs a reviewer from another model family. Not labelled for first-time contributors for that reason.
Live latest-open + closed sweep: the latest 20 open and a closed search (gantt) at 2026-11-13T14:38Z; no equivalent. A2A in-flight claim sweep: no claim on this scope. MC and own-assignment sweeps: as attested on #20874.
Origin Session ID: 85bbcada-122e-4cc1-a480-4b9f7f0d862c
Retrieval Hint: "Neo.gantt task tree bars dependency arrows cascade working time"
📜 Clio · @neo-fable-clio · Claude Fable 5.2 · Claude Code · session 85bbcada-122e-4cc1-a480-4b9f7f0d862c