LearnNewsExamplesConnect
Frontmatter
assigneesneo-fable-clio
createdAtNov 13, 2026, 4:09 PM
updatedAtNov 13, 2026, 4:51 PM
githubUrlhttps://github.com/neomjs/neo/issues/20881
authorneo-fable-clio
commentsCount0
parentIssuenull
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[]
blocking[]
closedAtNov 13, 2026, 4:29 PM
milestonev14.0

ROADMAP: the next cut is Engine 14, with a fifth cornerstone

Closed v14.0.0/archive-v14-0-0-chunk-2 documentationenhancementai
neo-fable-clio
neo-fable-clio commented on Nov 13, 2026, 4:09 PM

Context

ROADMAP.md holds the next release's scope and is the session intake for contributors and agents. Its "Next" section describes Engine 13.5 with four cornerstones.

On 2026-11-13 the epic #20874 was filed: a board, a scheduler and a Gantt chart join the engine's component families on one shared time axis, in five leaves. The maintainers decided the same day that the cut of Monday 2026-11-23 carries these families and is planned as 14.0.0. The repository owner names the release on the reading of Friday 2026-11-20.

The Problem

  • The roadmap names neither the epic nor the version. Whoever starts there does not find the largest block of the window. Until today the epic and its leaves were not in the milestone either.
  • The intake paragraph invites "a one-PR leaf under one of the cornerstone epics". The four family leaves of #20874 are contributed by the maintainers in one pull request each; a contributor who reads the intake and starts a board from scratch loses the work.
  • A major version has a cost the section does not state: create-app writes "neo.mjs": "^13.4.0" into every new app (tasks/createPackageJson.mjs:50 in neomjs/create-app, read at 95aa784), so npx neo-app installs 14 only after a create-app release.

The Architectural Reality

  • ROADMAP.md, section "Next: Engine 13.5 — The Front Door": the heading, the thesis paragraph, the gate, the cornerstone table (four rows), "Carried in the milestone", "How it runs", "Deferred" and "Session intake".
  • #20874's body opens with a Terminal predicate: line. The table's "Done signal" column summarizes that line for each row.
  • The update-roadmap workflow's core rule: a roadmap is a thesis, the cornerstones and an explicit deferred set; the full work set is the milestone's linked items and is never listed in prose.
  • Milestone 14 holds #20874 and its five leaves since 2026-11-13T15:06Z. The roadmap refers to the milestone by number, never by title.

Design authority: n/a — the ticket calls no existing behaviour wrong; it brings a planning document in step with a filed epic and a release decision.

The Fix

In ROADMAP.md only:

  • The heading and the thesis paragraph name Engine 14 and say why: three planning views and their time axis join the component families.
  • One paragraph says how the number is confirmed: the four families are on dev by Thursday 2026-11-19, 24:00 UTC; on Friday 2026-11-20 a fresh npx neo-app app on a packed build of dev builds its themes, moves a card, reschedules a booking, edits a linked task and finds its own records again after a reload; a family that misses rides the next cut; create-app is released on cut day, after the engine is on npm.
  • The cornerstone table gains row 5: #20874, steward Clio, a done signal that summarizes the epic's terminal predicate.
  • "Deferred" gains the calendar's move onto the shared time axis and server-backed loading for the new families.
  • "Session intake" says that the four family leaves are maintainer lanes, and that themes, examples and guides open under the epic as each family reaches dev.

Acceptance Criteria

  • The section's heading and thesis name Engine 14 and its reason, and no sentence of the section still calls the next cut 13.5.
  • The cornerstone table has five rows. Row 5 links #20874, names its steward and carries a done signal that agrees in substance with the epic's Terminal predicate: line.
  • The section states the merge date, the check from a generated app, what follows when a family misses, and that create-app is released on cut day.
  • "Deferred" names the calendar's move onto the shared time axis and server-backed loading for the new families.
  • "Session intake" says which leaves of #20874 are open to contributors, and when.

Post-Merge Validation

  • Milestone 14's title and description name the release as the merged roadmap does: "v14.0", renamed 2026-11-13T15:30Z after the merge (f63d19ce36).

Out of Scope

  • The gate sentence and the cadence paragraph's throughput figure.
  • The epic's leaves, their owners and their bodies.
  • create-app's own change and the release notes; both belong to the cut.

Avoided Traps

  • A second "Next" section for 14 beside 13.5. The roadmap holds one next release; a run replaces the scope, it never appends one.
  • Listing the five leaves in prose. The milestone holds them, and a prose list goes stale with the first split.
  • A fallback name written into the roadmap. The number is confirmed on the reading; the roadmap says what follows for a family that misses, not what the release is then called.

Related

Related: #20874 · #20668 and #20685 (wrote and extended the section) · #20498 (the examples standard the new families fall under) · #20667

Live latest-open + closed sweep: the latest 20 open (created-descending; 34 open, orange band, and no open ticket or epic owns this edit: #20874 is the epic the edit serves and cannot be a pull request's close target) and two closed searches (ROADMAP cornerstone version 14; roadmap in the title) at 2026-11-13T15:08Z; the closed hits #20668, #20685, #20401 and #20465 are delivered predecessors, none equivalent. A2A in-flight claim sweep: the newest 12 rows of all read-states to 15:08Z; no claim on the roadmap or on the version. MC sweep: "v14 engine roadmap: board scheduler Gantt families as a cornerstone, milestone rename from 13.5", 6 results; the earlier roadmap runs (13.4, 13.5) are the precedent, no prior decision on this edit. Own-assignment sweep: 4 open (#20874, #20726, #20682, #20498); none is this edit.

Owner: self-assigned at creation. It is a same-day edit by the cornerstone's steward to a document that has to agree with the milestone, so it is not offered as a first issue.

Origin Session ID: 90bbc21b-db8e-4648-babf-8e183e958246

Retrieval Hint: "Engine 14 roadmap fifth cornerstone board scheduler Gantt, version confirmed on the Nov 20 reading"

📜 Clio · @neo-fable-clio · Claude Fable 5.2 · Claude Code · session 90bbc21b-db8e-4648-babf-8e183e958246

tobiu referenced in commit f63d19c - "docs(roadmap): the next cut is Engine 14, with a fifth cornerstone (#20881) (#20882) on Nov 13, 2026, 4:29 PM
tobiu closed this issue on Nov 13, 2026, 4:29 PM