LearnNewsExamplesConnect
Frontmatter
assigneesneo-gemini-maryam
createdAtNov 14, 2026, 3:36 AM
updatedAtNov 19, 2026, 8:28 PM
githubUrlhttps://github.com/neomjs/neo/issues/20926
authorneo-gpt-emmy
commentsCount1
parentIssuenull
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[]
blocking[]
closedAtNov 19, 2026, 8:28 PM

Give the Workstation one visitor-facing tour

Closed v14.0.0/archive-v14-0-0-chunk-2 bughelp wantedgood first issuedesignaitesting
neo-gpt-emmy
neo-gpt-emmy commented on Nov 14, 2026, 3:36 AM

Please comment to claim before starting; check current assignees and linked PRs.

Context

On first launch the Workstation asks a visitor to choose between Start dense tour and Start film tour. Both are real playback paths. A visitor has to know how we produced the demo to choose their first click. Tour toolbar at the reported revision

The Problem

Film production and test playback acquired their own product entry points. Moving the two choices into a menu would still leave the visitor with two tours.

The Architectural Reality

Design authority: Tobi’s Workstation review, November 14, 2026: “i insist that there is one tour”. The earlier topology toolbar decision reserves the second row’s actions for Reset to default, Undo and Redo. The shared Workstation owns both headers. Its tour controller already has a programmatic path for exercising a specific script.

The Fix

Offer one Start tour action and one visitor-facing sequence. Choose or combine the existing scenes into that sequence. Keep capture and test playback accessible to their callers through the tour driver. Update the Workstation README and any tests that teach the two-launcher UI.

Acceptance Criteria

  • On a fresh launch, one keyboard-accessible Start tour begins the product tour directly. There is no second visitor tour, mode picker or alternate launcher elsewhere in the UI. Conditional Continue advances the running tour.
  • In the normal Workstation browser suite, inspect the rendered actions across both global header rows on first paint and during playback. Scope the assertion by header ownership and semantic action so a new or renamed test button, including an icon-only one, fails the check. Theme and tour progress remain usable. The topology row offers Reset to default, Undo and Redo.
  • Demonstrate that the check catches an extra action, then run it against the final UI. The product tour completes, and the existing scripted film/test journeys can still run through their drivers. Include a first-launch header frame in the PR.
  • Record the placement rule beside the existing Workstation UI guidance: a new demo or test scenario uses the runner or fixture; a new function belongs where a person uses it. A deliberate change to the global actions changes the documented design and its test together.

Verification starting points: WorkstationTourActivationNL.spec.mjs already boots the real app and exercises playback. WorkstationTopologyGroupsNL.spec.mjs already checks the three layout actions.

Out of Scope

The film edit, caption wording, and a redesign of Workstation layout or history.

Related: #18680, #18458, #19070. The earlier film work supplies reusable scenes and playback. This decision supersedes the two public start buttons.

Unowned-rationale: ready for a contributor; maintainers provide the design decision and review. Live open and closed ticket, assignment, recent mailbox and prior-art sweeps on November 14 found the earlier playback and topology work and no open equivalent (52 open issues at the check).

Retrieval Hint: Workstation one Start tour, dense tour film tour, main header action placement

ajendras referenced in commit a729f02 - "Workstation: one visitor-facing tour on Nov 15, 2026, 11:15 AM
ajendras cross-referenced by PR #21018 on Nov 15, 2026, 11:15 AM