LearnNewsExamplesConnect
Frontmatter
assigneesneo-opus-vega
createdAtNov 15, 2026, 5:19 PM
updatedAtNov 23, 2026, 12:52 PM
githubUrlhttps://github.com/neomjs/neo/issues/21033
authorneo-opus-vega
commentsCount30
parentIssuenull
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[]
blocking[ ] 61 Bump neo-app and the generated neo.mjs range to 14.0.0 on cut day, [x] 20667 The engine hosts packages that live outside its repository
milestonev14.0

Cut Engine v14.0.0 through the release PR

Open Backlog/active-chunk-1 enhancementaibuild
neo-opus-vega
neo-opus-vega commented on Nov 15, 2026, 5:19 PM

Context

Engine 14 is the front-door release (ROADMAP.md, Next: Engine 14 — The Front Door; milestone v14.0), cut on Monday 2026-11-23, seven years to the day after the public release announcement. This ticket is the cut's record, following #20655 (13.4.0), #20022 and #19652. It holds the readiness and gate readings and the cut mechanics, and it stays open until finish, npm and the Portal read back. The notes are their own epic, #21032. The release leaf that prepare --ticket resolves is #21775, filed on Sat 21 Nov once the version was read.

The Problem

Eight days before the cut, nothing tracked the cut itself: ROADMAP.md names a steward per cornerstone and none for the cut, and no record, notes or release leaf existed. Three things differ from 13.4.0:

  • No bump leaf. #20664 merged: prepare --version <semver> sets the version in the release commit and drops the released notes there, so 13.4.0's separate bump PR (#20656) has no successor.
  • The number is read, not assumed. The release is planned as 14.0.0 because a board, a scheduler and a Gantt chart join the engine's component families (#20874). It takes its number from the generated-app check on Friday 2026-11-20: Clio runs it on a tarball packed from dev, and I read it and post the reading on #20874. The receipts that run records are listed in #20874's comment issuecomment-6858285843. A family that misses rides the next cut.
  • The gate is observed on neomjs.com, and the Portal reaches neomjs.com only through an Engine cut (neomjs/pages builds from the published package). So the gate's clauses tick after the deploy. A Portal built from dev shows the same pages before the cut, and the notes read them there first. A cornerstone that is not done stays open with its steward instead of holding the cut (ROADMAP.md, How it runs), and the notes say so.

The Architectural Reality

buildScripts/release/publish.mjs releases in two phases joined by one human step:

  • prepare --version <semver> --ticket <leaf> --body-file <body> checks that dev is at origin/dev and clean, that the version is newer than package.json's, that .github/RELEASE_NOTES/v<version>.md exists and that no tag exists. It then sets the version, drops the released notes, stamps the note, runs prepare.mjs and build-all, commits to release/v<version> and opens a PR to dev.
  • The operator merges that PR once dev's required checks and CodeQL pass.
  • finish squashes the merge onto main with the atomic-commit line, tags it and creates the GitHub release, whose event runs npm-publish.yml (Trusted Publishing).

Re-running a phase continues it (releaseState.mjs); --rehearse changes nothing.

Design authority: n/a — this ticket calls no existing behaviour wrong; it runs publish.mjs as its JSDoc describes.

The Cut

  1. Sat Nov 21 (moved from Fri Nov 20): the generated-app check, run by Grace at 12:00 CET for Clio; the four families are on dev by Thu Nov 19, 24:00 UTC. My reading on #20874 fixes the version: 14.0.0 (issuecomment-7061569523).
  2. The operator names the cut head. There is no merge hold: Engine work, fixes, reviews and his merges stay open until he cuts (operator, 23 Nov, relayed by Emmy in issuecomment-7093923459 on #21934). When he stops merging, dev's head is the cut head, and steps 3 to 6 run on it in order, so the notes count the head that ships (a pass written earlier is stale at prepare; Mnemosyne, issuecomment-7069580979).
  3. The cut-day data is re-checked on the cut head; a run whose output changed lands as one PR before the notes' refresh:
    • the SEO map (#20671), first. Since #21809, prepare.mjs writes seo.json into the release commit, so the cut commits no regeneration by hand. On the candidate, node buildScripts/docs/seo/verify.mjs exits 0; if a later merge left the tracked file behind, regenerate it in a scratch tree (generate.mjs -f seo-json) and read the counts there, because prepare writes the copy that ships. Since #21810, prepare --release stamps the note with the paths it dates, so the merge commit's seo.json keeps the cut date through a later squash. It runs before the figures, so the inventory and the notes count the routes that ship;
    • the figures (#21576): node buildScripts/release/engineInventory.mjs; if a copy differs, --write, so the README npm freezes carries this release's figures;
    • the hero's record (#21586, run from 06:00 UTC by whoever self-assigns it: Mnemosyne released it on 22 Nov, issuecomment-7081984813; unclaimed at 05:30 UTC, Vega runs it): GH_TOKEN=$(gh auth token) node buildScripts/docs/recordWeek.mjs --to <the cut day>, one PR with apps/portal/resources/data/record-week.json. --to ends the window at 00:00 UTC, so on 23 Nov the hero shows 16 to 22 Nov.
  4. The notes' final iteration merges (#21032): banner off, the Release Type and Stability lines as the operator confirms them (release-notes §4; the reading fixed the number, 14.0.0), counts at the cut head, the SEO lines (routes, their schema split, the sitemap's core URLs) read from the regenerated seo.json.
  5. The release leaf is #21775, filed and rehearsed on Sat 21 Nov (every gate ✅ on 7cd0d6618e, issuecomment-7061603365). On the candidate, prepare --version 14.0.0 --rehearse --ticket 21775 --body-file <body> reports every gate ✅ again.
  6. prepare opens the release PR, and the operator merges it. This is the cut's one human step.
  7. finish, then the read-backs: the release body, npm, Brain npm run ai:post-release-sync, the Pages deploy, the crawler snapshots (after the Pages deploy the operator kickstarts com.neomjs.middleware-rebuild on his machine, launchctl kickstart gui/$(id -u)/com.neomjs.middleware-rebuild, since it syncs to the bucket and rolls Cloud Run with his deploy credentials; otherwise the next 8-hour tick ships it. Once the log prints DONE: content wave shipped, a Googlebot user agent gets 200 on /news/releases/14.0.0 and on the release post; Grace, issuecomment-7068233378), node buildScripts/docs/seo/verify.mjs on the merge commit exits 0 (#21810), neomjs/create-app#61 once npm view neo.mjs@<version> version answers (decision A at the Sun 17:00Z lock, create-app#81 issuecomment-7082629334: #78's pin commit sets neo.mjs ^14.0.0 and AGENT_SKILLS_RANGE to the caret of 14.0.0's neo-agent-skills pin, ^2.4.0 while the Engine pins 2.4.0; #81 merges #78's head 76ab3ecd00, so it carries that pin; parity re-runs on that head, and Euclid approves it; the operator merges ONLY #81, as a merge commit, and #78, a draft, rides inside it. npm-publish.yml publishes from each main push's own SHA whenever npm lacks the version, so a second create-app merge would publish 14.0.0 without the other change (Euclid's race, 23 Nov; the order is on create-app#78 issuecomment-7092371882). That one push publishes 14.0.0. Euclid's substance read of #81 is done before the cut; his formal approval follows a green parity on the exact head, which needs the engine on npm (the review CI rule), so after the engine's publish the order is the parity re-run, his approval, the operator's merge. Until npm view neo-app@14.0.0 version answers, npx neo-app@latest still builds a 13.4 workspace (Mnemosyne, 23 Nov), so nothing that tells a reader to run it, such as the release-day post #21043 or a social post, goes out before that answer), and #20667's predicate on the published engine: the 11-17 rehearsal (issuecomment-6952177617) re-run with neo.mjs@14.0.0 installed from npm into a copy of one private package (build, themes, units, e2e), result recorded on #20667.

Acceptance Criteria

Readiness:

  • AC-1: The reading of #20874's generated-app check (moved from Fri Nov 20 to Sat Nov 21, issuecomment-7041237362) is posted on #20874 and names the version this cut passes to --version. (14.0.0: issuecomment-7061569523, on Grace's run issuecomment-7061541920.)
  • AC-2: The notes' final iteration is merged on dev as .github/RELEASE_NOTES/v<version>.md for that version, its banner removed, and #21032's cut-readiness checklist (release-notes §7) passes.
  • AC-3: prepare --rehearse on dev reports every gate ✅. The candidate commit and its Engine Tests (unit, components and the e2e engine tier, one workflow since #21666) and CodeQL runs are recorded here.

Cut mechanics:

  • AC-4: The cut head is the operator's: the notes' final refresh and any changed cut-day data are taken on it, and between that refresh and the release PR's merge only the notes PR and a data PR the refresh names reached dev; no ruleset bypass. (Rewritten 23 Nov after the operator withdrew the 07:00 UTC hold.)
  • AC-5: finish's squash push to main succeeded, and the GitHub release body ends with the atomic-commit line.
  • AC-6: npm-publish.yml published the release through Trusted Publishing, and npm view neo.mjs@latest version reads it, with provenance.
  • AC-7 (post-release): Brain ai:post-release-sync ran; after the Pages deploy, #/news/releases/<version> renders the note with its atomic-commit line; neomjs/create-app#61 shipped.

The gate (ROADMAP.md), read on neomjs.com after the deploy. A clause that reads short is recorded here with its cornerstone's open remainder:

  • AC-8 (post-release): The home section says what Neo is and who it is for (#20682).
  • AC-9 (post-release): Each component family's examples open as an overview in which every example names what it proves (#21140).
  • AC-10 (post-release): Connect shows a support path (#20677).
  • AC-11: One new good first issue was opened on every day from 2026-11-09 through the cut day. (Baseline at 2026-11-15 16:17Z: every day from Nov 9 to Nov 15 has at least one, 72 in all. Met through 23 Nov, the planned cut day: 144 in all, at least two on every UTC day, today #22043 and #22063 (Euclid's receipt, re-measured with GitHub Search at 05:1xZ). A later cut day needs its own.)

Out of Scope

  • The note's prose (#21032) and the release's contents (milestone v14.0 and its cornerstone epics, each closed by its steward).
  • Outbound posts about the release.
  • The post-release roadmap beat (update-roadmap) and the Brain and Institution lines.
  • A verify.mjs --in-memory guard on PRs: #21539, after the cut. (prepare regenerating the SEO map landed before the cut in #21809, its date parity in #21810.)

Related

#20655 (the 13.4.0 record, the precedent) · #21032 (the notes) · #21775 (the release leaf) · #20664 (prepare --version) · #20874 (the four families and the Nov 20 check) · #20682, #21140, #20677 (the gate's clauses) · neomjs/create-app#61 (the generator follows the cut) · #21539 (the shared catalog files) · milestone v14.0

Sweeps, 2026-11-15 16:13–16:18Z:

  • GitHub: the latest 20 open issues (52 open: red band, and no owner exists to fold into) and open and closed searches for "v14 cut", "14.0.0", "Cut Engine", "Engine 14 release" and "release notes 14". #20655, #20022 and #19652 are the precedents; no v14 cut ticket exists.
  • A2A: the latest 30 messages in all read states. A lane call found the cut unheld, and I claimed it at 16:09:20Z; a later lane-intent on the same lane (16:13:10Z) has my claim.
  • Memory Core: one query on the problem's nouns; no prior decision.
  • Own open assignments: #20925 and #20667; neither overlaps.

Steward: Vega. The merges stay the operator's.

Retrieval Hint: "v14 cut record front door publish.mjs prepare --version merge hold finish Nov 23"

tobiu referenced in commit 6ed80fc - "docs(blog): Engine 14's release-day post (#21041) (#21043) on Nov 23, 2026, 1:53 PM