LearnNewsExamplesConnect
Frontmatter
assigneesneo-opus-ada
createdAtNov 20, 2026, 7:45 PM
updatedAtNov 21, 2026, 2:33 PM
githubUrlhttps://github.com/neomjs/neo/issues/21626
authorneo-fable-clio
commentsCount6
parentIssue21346
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[x] 21692 A Gantt''s links paint over its locked columns after a horizontal scroll, [x] 21684 A timeline ignores the columns before it in its scrolling region
blocking[]
closedAtNov 21, 2026, 2:33 PM

A Gantt example adds custom columns beside the task tree

Closed v14.0.0/archive-v14-0-0-chunk-5 enhancementaiportal
neo-fable-clio
neo-fable-clio commented on Nov 20, 2026, 7:45 PM

Context

A leaf of #21346, the planning examples under #21140. The visitor's question: can the table beside the bars carry our columns: an outline number, an owner, dates, days, progress?

No contributor labels: the capability is read from the source (the check on #21346) and has not been driven in a browser. A maintainer builds it, and the drive is the first step.

The Problem

Both Gantt examples show one column, the task tree. A project manager reads the table as much as the bars, and the engine's task side takes column descriptors.

The Architectural Reality

  • taskColumns_ (src/gantt/Container.mjs:71): descriptors for the locked task columns. The default is one tree column, {type: 'tree', dataField: 'title', locked: 'start'}.
  • Tree filtering exists and is untested in the Gantt, and a cell edit does not cascade (the source check linked above). The columns of this example are read-only.
  • Template: examples/gantt/basic (not edited). Specs for the family: test/playwright/e2e/gantt/.
  • Shared files stay out of this pull request (#21539: every examples pull request that edits them makes the others stale): the catalog's data, its two specs and test/playwright/externalBrainSelection.mjs belong to #21613, which takes the record below as written.
  • Design authority: n/a — a new example; it calls no existing behaviour wrong.

The Fix

  1. Drive it first on a scratch copy of the base example: seven columns, two of them with a renderer, a collapsed phase, and a horizontal scroll of the chart. A defect becomes an engine ticket, linked here as a blocker.
  2. A new folder examples/gantt/taskColumns: a festival's production plan. About 30 tasks in five phases. The columns: outline number, task (the tree), owner with initials in a badge, start, end, days, and percent done as a small bar. The data ships with the example, in stores of models.
  3. The record, for #21613: id gantt-task-columns, name "Your columns beside the plan", feature "Seven task columns: outline number, tree, owner, dates, days and a progress bar", lookFor "Collapse a phase: its rows fold in the table and in the chart together. Scroll the chart: the columns stay." Cover: the table with its owner badges and progress bars, the chart beside it.

Acceptance Criteria

  • At 1440 × 900 the seven columns stand beside a chart that keeps at least half of the width.
  • Collapsing a phase folds its rows in the table and in the chart, and the two stay aligned.
  • At 390 × 844 the tree column alone stays locked, and the pull request shows that frame.
  • A spec under test/playwright/e2e/gantt/ asserts the column count and that table rows and chart rows match after a collapse.
  • No console error. Every theme the base example's neo-config.json lists.
  • Look: the first frame at both sizes, in the dark theme, is on the pull request beside gantt/basic's, read cold by one reader of the builder's seat. Numbers are right-aligned, dates share one format, and the badge and the progress bar are designed for the dark and the light theme.
  • The pull request edits no shared file.

Out of Scope

Engine changes. Editable cells. Tree filtering. Reordering or resizing the columns.

Avoided Traps

  • Seven columns of plain text. Two of them show what a renderer can do.
  • Columns so wide that the chart disappears.

Related

Parent #21346 · #21140 (the Gantt row of its content table) · #21613 (publication) · #21619 (the scheduler's resource columns).

unowned-rationale: open to a maintainer now. It ships with Engine 14 if it has merged by Sun 22 Nov 12:00 CET, so that #21613 can publish it before the lock; otherwise the week after.

Live latest-open + closed sweep: latest 20 open read (62 open before this batch, red band: a leaf of the owning epic #21346), open and closed search ("scheduler OR gantt OR board example", titles read; #21355, #21356 and #21357 are the three examples this epic has delivered) at 2026-11-20T18:41Z: no equivalent and no prior exclusion. A2A in-flight sweep: the latest 12 messages, all read-states, back to 18:23Z: no claim on a planning example. MC sweep ("scheduler, Gantt and task board show two examples each; which new planning examples does the release need"): 6 results, turns of 7 to 20 Nov, no decision that excludes this example. Own-assignment sweep: 8 open; #21346 is the parent.

Decision Record impact: none.