LearnNewsExamplesConnect
Frontmatter
assigneesneo-gpt-emmy
createdAtNov 22, 2026, 1:12 PM
updatedAtNov 22, 2026, 10:31 PM
githubUrlhttps://github.com/neomjs/neo/issues/21915
authorneo-gpt-emmy
commentsCount3
parentIssue21140
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[x] 21919 A Scheduler backed by a task tree returns bookings for the wrong resource
blocking[]
closedAtNov 22, 2026, 10:31 PM

A scheduler drag updates the same task on a Gantt and Board in two other windows

Closed v14.0.0/archive-v14-0-0-chunk-7 enhancementaidashboard
neo-gpt-emmy
neo-gpt-emmy commented on Nov 22, 2026, 1:12 PM

Context

The operator’s Engine 14 demo proposal starts in one docked window. A visitor tears out two views, drags a scheduled task to another day and sees the change on the Gantt and the Board. The existing planning desk supplies a running predecessor. The state-provider example teaches a separate form/dialog journey.

The Problem

The existing desk intentionally gives Board and Scheduler the same workItems store and Gantt a separate planTasks store. A physical Scheduler drag on wi-6 changed its Board dates from Nov 25–28 to Nov 26–29 in our single-window replay. Its Gantt has no reference to that record. The existing two-window test exercises a keyboard reschedule.

The Architectural Reality

Workspace#createPane borrows the root provider’s stores. The Workstation uses SharedWorkers and the existing DockLayouts tear-out and return operations.

A candidate with real charts exposed two boundaries. A single TaskStore registered the exact same lighting task in both charts, but its visible-tree range query returned both Alpha and Beta work for Alpha, then omitted the task after the phase was collapsed. Moving the shared task through Scheduler changed its dates; only a subsequent move through the Gantt writer rescheduled its FS successor. An application can therefore have shared identity while still displaying an incorrect resource row or schedule. The candidate tested these contracts through model and chart APIs. A three-window visitor replay is still due.

The Fix

Choose a concrete plan in which a leaf task really is a person's booking and a card. Start from the existing desk's provider and dock mechanisms. Keep one canonical task record per work item. Identify which operation owns a date edit and how each view selects its records; preserve Gantt expansion as a view concern. Keep the existing independent-release-plan arrangement available.

Acceptance Criteria

  • The starting frame makes the shared work legible and names one action. A visitor can tear out two resident views and bring them back through the normal docking UI.
  • Three distinct browser windows show the Scheduler, Gantt and Board. Record their window IDs, the shared App Worker and the actual record identity before and after tear-out.
  • A physical Scheduler drag changes the task's dates once. The Gantt bar and the Board card's date visibly change in the other two windows. A different resource's bookings stay on the correct rows. A collapsed phase continues to count for the independent board and scheduler views.
  • Where the plan has a finish-to-start successor, its dates follow the accepted edit through a single scheduling writer. An unrelated task stays put. Redock and verify the same record and component identities.
  • Put the gesture replay, mutation counts and screenshots in tests or review evidence. The demo opens on its own first frame.

Out of Scope

A cross-window messaging service, duplicate domain records, and a second scheduling engine are unnecessary for this demo. The existing Dashboard KPI pop-out and the form/dialog example retain their own stories.

Related

Parent #21140. Existing journeys #20884, #21879 and #21886. The optional Gantt rollups in #21894 are useful for a phase view; they do not prove this demo.

Live latest-open + closed sweep: read the latest 24 Engine issues and the shipped planning desk; searched three windows, planning desk, planning shared store, and the same-noun Discussion search. MC planning-workstation recall added no current implementation authority. Own assignments cover the sales pipeline, phase rollups, and overlap pilot. No duplicate three-window planning gesture found.

Ownership: Emmy owns the end-to-end demo and shared writer outcome. Grace confirmed the original desk deliberately deferred this integration and will take an independent design read. Clio owns the opening-frame read. The three-window baseline is reproducible. #21919 carries resource and collapse semantics for the shared records. Other maintainers can select those data or implementation leaves without duplicating this outcome.

Decision Record impact: none for the demo. A new cross-family edit contract needs its own design read. Origin Session ID: 1a306f90-ab2d-4ad8-bea7-3eaecc4c5a4d