Context
#21032 is the epic for Engine 14's release notes. Its workflow (release-notes §1) merges iteration 1 early, behind a banner. The census that iteration 1 is drafted from is complete:
The census promised that a correction posted on #21032 by Mon Nov 16, 18:00 UTC lands in iteration 1. That promise holds: the PR stays open for corrections until then.
The Problem
The rows hold the stories, but no document carries them yet, and publish.mjs prepare refuses to cut without .github/RELEASE_NOTES/v<version>.md. Live GitHub at 2026-11-16T01:38Z counts 169 merged pull requests and 158 closed issues in neomjs/neo since 13.4.0 was published (2026-11-09T13:58:43Z).
The Architectural Reality
publish.mjs requires .github/RELEASE_NOTES/v{version}.md and keeps the file as the release's archive (release-notes §6).
test/playwright/unit/buildScripts/docs/seo/Generate.spec.mjs refuses blob/main and release-ref Neo source links in every .github/RELEASE_NOTES/*.md; dev and commit refs pass.
- The bar is a set (release-notes §5): 13.0.0, the last major, with five hero chapters, and 13.4.0, the previous note, whose thirteen sections the new one keeps or drops by a recorded decision (§7).
ROADMAP.md names the release Engine 14 — The Front Door: five cornerstones, the Connect support path carried in the milestone, and a gate sentence for neomjs.com. 14.0.0 is planned; the Nov 20 reading on #20874 fixes the number, and the file is renamed if it changes.
The Fix
Author .github/RELEASE_NOTES/v14.0.0.md:
- The header block, with
Release Type and Stability pending the operator (§4), and the iteration banner.
- The TL;DR and 14 in 2 Minutes: the ROADMAP's frame, the scale from a live search with its time, and the honest bound. The bound is what reaches
dev by Thu Nov 19 and what stays open at the cut, per the census.
- One chapter per census arc: discoverability (#20671), the home section (#20682), examples and learning (#20498), board, scheduler and Gantt (#20874), packages outside the repository (#20667), and the outside contributors (#20892).
- Also in 14, What you can try, Upgrading from 13.4.0 and What comes next, kept from 13.4.0. Each section a later iteration has to mine says so in place.
- A Full Changelog tail, marked as regenerated at the cut.
Every number is checked against its primary when it is written (§4).
Acceptance Criteria
Out of Scope
- The per-arc mining leaves (§3): War Stories, case studies with clock time, verbatim moments.
- Screenshots and the read at the note's Portal route.
- The final iteration: banner off, counts at the cut head, designations, the §7 checklist.
- The release-day post (#21041).
Avoided Traps
- Counting from the corpus. At this filing its latest publish is 2026-11-15T21:48Z, and its run counts 160 PRs where live GitHub counts 169.
- A changelog dump. The census rows carry the stories; the grouped list only closes the note.
- Shrinking the window to its headline. "The Front Door" names the gate, not the extent (#21032's Problem).
Related
Parent: #21032 · cut record: #21033 · cornerstones: #20498, #20667, #20671, #20682, #20874 · carried: #20677 · release goal: #20892 · release-day post: #21041
Ownership: self-assigned (Vega, the notes' author).
Live latest-open + closed sweep: the latest 20 open issues plus an open and closed title search (release notes), at 2026-11-16T01:4xZ. 60 open issues: red band. The owning epic is #21032, and this is its first leaf. No iteration leaf exists. The closed precedent #19747 (13.3.0, iteration 1) was read for shape, Out of Scope and Avoided Traps.
MC sweep: "Engine 14 release notes iteration 1 staging note", 6 results, no earlier v14 draft.
Own-assignment sweep: #21032 (the parent) and #21033 (the cut record) on this surface.
A2A sweep: the 30 newest messages, read immediately before filing; no claim on this scope.
Origin Session ID: 4ceaef79-0f34-434e-9b51-f4b962782ceb
Retrieval Hint: "Engine 14 release notes iteration 1", "The Front Door"
— Vega (Opus 5.5, Claude Code) 🌿
Context
#21032 is the epic for Engine 14's release notes. Its workflow (release-notes §1) merges iteration 1 early, behind a banner. The census that iteration 1 is drafted from is complete:
The census promised that a correction posted on #21032 by Mon Nov 16, 18:00 UTC lands in iteration 1. That promise holds: the PR stays open for corrections until then.
The Problem
The rows hold the stories, but no document carries them yet, and
publish.mjs preparerefuses to cut without.github/RELEASE_NOTES/v<version>.md. Live GitHub at 2026-11-16T01:38Z counts 169 merged pull requests and 158 closed issues inneomjs/neosince 13.4.0 was published (2026-11-09T13:58:43Z).The Architectural Reality
publish.mjsrequires.github/RELEASE_NOTES/v{version}.mdand keeps the file as the release's archive (release-notes §6).test/playwright/unit/buildScripts/docs/seo/Generate.spec.mjsrefusesblob/mainand release-ref Neo source links in every.github/RELEASE_NOTES/*.md;devand commit refs pass.ROADMAP.mdnames the release Engine 14 — The Front Door: five cornerstones, the Connect support path carried in the milestone, and a gate sentence for neomjs.com. 14.0.0 is planned; the Nov 20 reading on #20874 fixes the number, and the file is renamed if it changes.The Fix
Author
.github/RELEASE_NOTES/v14.0.0.md:Release TypeandStabilitypending the operator (§4), and the iteration banner.devby Thu Nov 19 and what stays open at the cut, per the census.Every number is checked against its primary when it is written (§4).
Acceptance Criteria
.github/RELEASE_NOTES/v14.0.0.mdexists ondevwith the iteration-1 banner, andRelease Type/Stabilityread as pending the operator.devor commit refs, andGenerate.spec.mjspasses.Out of Scope
Avoided Traps
Related
Parent: #21032 · cut record: #21033 · cornerstones: #20498, #20667, #20671, #20682, #20874 · carried: #20677 · release goal: #20892 · release-day post: #21041
Ownership: self-assigned (Vega, the notes' author).
Live latest-open + closed sweep: the latest 20 open issues plus an open and closed title search (
release notes), at 2026-11-16T01:4xZ. 60 open issues: red band. The owning epic is #21032, and this is its first leaf. No iteration leaf exists. The closed precedent #19747 (13.3.0, iteration 1) was read for shape, Out of Scope and Avoided Traps. MC sweep: "Engine 14 release notes iteration 1 staging note", 6 results, no earlier v14 draft. Own-assignment sweep: #21032 (the parent) and #21033 (the cut record) on this surface. A2A sweep: the 30 newest messages, read immediately before filing; no claim on this scope.Origin Session ID: 4ceaef79-0f34-434e-9b51-f4b962782ceb Retrieval Hint: "Engine 14 release notes iteration 1", "The Front Door"
— Vega (Opus 5.5, Claude Code) 🌿