LearnNewsExamplesConnect
Frontmatter
assigneesneo-fable-mnemosyne
createdAtNov 23, 2026, 7:20 AM
updatedAtNov 23, 2026, 11:39 PM
githubUrlhttps://github.com/neomjs/neo/issues/22076
authorneo-opus-vega
commentsCount2
parentIssue21032
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[]
blocking[]
closedAtNov 23, 2026, 11:39 PM

Engine 14 release notes: the final pass at the cut head

Closed v14.0.0/archive-v14-0-0-chunk-7 documentationenhancementai
neo-opus-vega
neo-opus-vega commented on Nov 23, 2026, 7:20 AM

Context

Iteration 5 (#21776, PR #21777) wrote .github/RELEASE_NOTES/v14.0.0.md against dev 7cd0d6618e (21 Nov, 06:31Z). On 21 Nov the operator directed that the notes get no more iterations, only one final pass at the cut head. He merged the last approved pass between 05:53Z and 06:01Z on 23 Nov (dev 8e649faff9). The merge hold starts at 07:00 UTC (#21033 issuecomment-7093193157), and this pass is step 4 of the cut.

The Problem

The note still carries iteration 5's banner and two "Pending the operator" designation lines. Its counts were taken on 21 Nov: 486 merged PRs since 13.4.0, 89 outside merges, 371 routes and 312 core URLs, 128 examples. The 175 commits on dev since 7cd0d6618e are not in it, and among them is the web desktop tear-out (#22067).

The Architectural Reality

  • buildScripts/release/publish.mjs prepare --version 14.0.0 requires this exact file.
  • prepare writes seo.json into the release commit (#21809) and stamps the note's SEO dates (#21810). The SEO lines are therefore read from a regeneration at the cut head (#21033 step 3), never from the tracked file alone.
  • The release-notes workflow §7 is the checklist (.agents/skills/release-notes/references/release-notes-workflow.md).

The Fix

One PR to .github/RELEASE_NOTES/v14.0.0.md:

  1. Remove the banner and fill the designations. Release Type is a major release, Engine 14 — The Front Door; Stability is Stable (#21032 issuecomment-7093192843). The operator's merge of this PR is his confirmation gate.
  2. Fold the merges after 7cd0d6618e into their chapters, from Sophie's mining digest on #21032. Anchor every claim.
  3. Take the counts at the cut head, after the cut-day data PRs merge: PRs and issues since 13.4.0 (GitHub search, timestamped), outside-contributor merges, the SEO lines from the regenerated seo.json, and the catalog.
  4. Run §7: render beside 13.4.0, the numbers sweep last, then prepare --rehearse.

Acceptance Criteria

  • The banner is gone and both designation lines are filled.
  • Every merge after 7cd0d6618e that changes what a user can do appears in its chapter, with its anchor.
  • Every count names its instrument and timestamp, and was taken at the cut head after the cut-day data PRs merged.
  • The note renders at #/news/releases/14.0.0 and keeps 13.4.0's sections.
  • prepare --version 14.0.0 --rehearse --ticket 21775 --body-file <body> reports every gate ✅ with this PR's head merged.
  • A cross-family review approves the final head, and the operator merges it under the hold.

Out of Scope

  • The cut-day data PRs (#21033 step 3), the release PR (#21775), and the release-day post (#21041).

Related

Part of #21032 · #21033 step 4 · iterations #21079, #21083, #21566, #21742, #21776

Live latest-open + closed sweep: I checked the latest 20 open issues and searched open and closed issues for "release notes" (14, final) at 2026-11-23T06:20Z. 41 issues are open, in the orange band, and this leaf folds into epic #21032. I also checked the A2A claims (last 30, every read state) and my own assignments. No equivalent exists.

Origin Session ID: 54c2c0f3-a035-4e41-8425-cd6d2d5abb0b Retrieval Hint: "Engine 14 release notes final pass at the cut head"

tobiu referenced in commit 79a884f - "docs(release): Engine 14 release notes, the final pass at the cut head (#22076) (#22091) on Nov 23, 2026, 11:39 PM
tobiu closed this issue on Nov 23, 2026, 11:39 PM